Cape Agulhas
South Africa
South Africa
Electricity Supply By-law, 2005
- Published in Western Cape Provincial Gazette 6303 on 3 October 2005
- Commenced on 3 October 2005
- [This is the version of this document from 3 October 2005 and includes any amendments published up to 28 July 2023.]
Chapter 1
General
1. Deļ¬nitions
Chapter 2
General conditions of supply
2. Supply of Electricity by Municipality
Only the municipality may supply or contract for the supply of electricity within the municipal area.3. Supply by agreement
4. Compliance with notices
Any person on whom a notice duly issued or given under this by-law is served shall, within the time specified in such notice, comply with its terms.5. Application for supply
6. Processing of requests for supply
Applications for the supply of electricity will be processed and the supply made available within the periods stipulated in NRS 047.7. Wayleaves
8. Municipalityās right of access to premises
The occupier of premises must give the engineer or any duly authorised official of the municipality access at all reasonable hours to the premises in order to read, inspect, install or repair any meter or service connection for the supply of electricity, or to disconnect, stop or restrict the supply of electricity.9. Obstruction of employees
No person may wilfullyā10. Improper use
11. Tariffs, fees, availability charges and deposits
12. Interest on overdue accounts
13. Resale of electricity
14. Right to disconnect supply
15. Non-liability of the Municipality
The Municipality is not liable for any loss or damage, direct or consequential, suffered or sustained by a consumer as a result of or arising from the cessation, interruption or any other abnormality of the supply of electricity, unless caused by negligence on the part of the municipality.16. Leakage of electricity
No rebate will be allowed on the account for electricity supplied and metered in respect of electricity wasted owing to leakage or any other fault in the electrical installation.17. Failure of supply
18. Sealed and locked apparatus
Where the municipality has sealed or locked any meter, service protective device or other apparatus, whether or not belonging to the municipality, no person other than an authorised official of the municipality, may in any manner or for any reason whatsoever remove, break, deface, or tamper or otherwise interfere with any such seal or lock.19. Tampering with service connection or supply mains
20. Protection of Municipalityās supply mains
21. Prevention of tampering with service connection or supply mains
If the engineer decides that it is necessary or desirable to take special precautions in order to prevent tampering with any portion of the supply mains, service connection or service protective device or meter or metering equipment, the consumer must either supply and install the necessary protection or pay the costs involved where such protection is supplied by the municipality.22. Unauthorised connections
No person other than a person authorised thereto by the engineer in writing may connect, attempt to connect or cause or permit to be connected any electrical installation or part thereof to the supply mains or service connection.23. Unauthorised reconnections
24. Temporary disconnection and reconnection
25. Temporary supplies
If the engineer is of the opinion that any temporary supply of electricity is interfering with the efficient and economical supply of electricity to other consumers, the ejngineer may at any time with notice, or under exceptional circumstances without notice, terminate such temporary supply and, the municipality is not liable for any loss or damage suffered by the consumer by such termination.26. Temporary work
27. Load reduction
28. High, medium and low voltage switchgear and equipment
29. Substation accommodation
30. Wiring diagram and specification
31. Standby supply
No person is entitled to a standby supply of electricity from the municipality for any premises having a separate source of electricity supply, except with the written consent of the engineer and subject to such terms and conditions as may be laid down by the engineer.32. Consumerās emergency standby supply equipment
Chapter 3
Responsibilities of consumers
33. Consumer to provide and maintain electrical installation
The consumer must at own cost install and maintain any electrical installation connected or to be connected to the supply mains, and any additions or alterations thereto which may be made from time to time in accordance with this by-law and the regulations.34. Fault in electrical installation
35. Discontinuance of use of supply
A consumer who wishes the electricity supply to be discontinued, must give the municipality at least two full working daysā written notice, failing which the consumer will remain liable for all payments due for the supply of electricity until the expiration of two full working days after such notice has been given.36. Change of occupier
37. Service apparatus
Chapter 4
Specific conditions of supply
38. Service connection
39. Metering accommodation
Chapter 5
Systems of supply
40. Load requirements
41. Load limitations
42. Interference with other personsā electrical equipment
43. Supplies to motors
Unless otherwise approved by the engineer the rating of motors shall be limited as follows:Insulated service cable, size in mm2, copper equivalent | Maximum permissible starting current | Maximum motor rating in kW | ||
---|---|---|---|---|
mmĀ² | A | Direct on line (6 Ć full-load current) | Star/Delta (2,5 Ć full-load current) | Other means (1,5 Ć full-load current) |
Ā | Ā | kW | kW | kW |
16 | 72 | 6 | 13,5 | 23 |
25 | 95 | 7,5 | 18 | 30 |
35 | 115 | 9 | 22 | 36,5 |
50 | 135 | 10 | 25 | 45 |
70 | 165 | 13 | 31 | 55 |
95 | 200 | 16 | 38 | 67 |
120 | 230 | 18 | 46 | 77 |
150 | 260 | 20 | 52 | 87 |